12 | R | - | K1, skip next st and knit the second stitch drawing it over the skipped stitch; purl the skipped stitch* | slip next stitch to dpn and hold in front; p1, skip 1 stitch and knit the next stitch inserting the point of the needle into the stitch and then around the right-hand side of skipped stitch to catch yarn; then complete the knitting of this stitch drawing it over the skipped stitch and off the needle; yarn to front and knit the stitch from dpn; then p1 (the skipped stitch) | * | slip 1 stitch to dpn and hold in front; p1, k1 from dpn, k1 |